The first winter in a new-build villa, and the crack that belongs to nobody yet

New build on this coast means underfloor heating, aerotermia, sliding doors three metres wide and a developer who handed over the keys in June. By January the plasterboard joints have opened above the sliding door, two interior doors no longer close, and the pool has dropped four centimetres since Friday. The owner says the builder is still on site. The builder says the pool was the pool company's job. Nobody has written anything down.

Three clocks, one law

The Ley de Ordenación de la Edificación, 38/1999, gives three periods in article 17 and they run from the recepción de obra, the day the building was formally handed over, not from the day you moved in. Ten years for damage to foundations, load-bearing walls, slabs and other structural elements that compromises stability. Three years for defects in construction elements or installations that breach habitability: waterproofing, damp, drainage, heating, electrical. One year for defects of finish, and for that last one the builder answers directly.

The developer is not your landlord

In practice the three years are where most of the arguments live. A terrace that ponds water, a bathroom that leaks into the garage, an aerotermia that cannot hold pressure, a pool that loses two centimetres a day: all habitability, all inside three years. A hairline crack at a plasterboard joint, a door that has dropped, silicone that has gone black in the shower: finish, one year, and often normal settlement that the builder will fix once as a courtesy and not twice.

This is the part tenants get wrong, understandably. Your contract is with the owner. The owner's claim is with the developer, the builder and the professionals, and the ten-year structural cover sits in a seguro decenal that the developer had to take out. A tenant cannot sue the builder for a crack. What a tenant can do is document the defect, notify the owner the same day in writing, and keep the message. That message is the whole case later.

The documents that decide it

If the defect makes the house unfit, the ordinary rental rules take over. Article 21 requires the owner to carry out the repairs needed to keep the dwelling habitable, and article 26 allows a proportional reduction of the rent once the problem has been notified and persists. Proportionate is doing a lot of work in that sentence. A bathroom out of action for three days is not a 50 per cent month. Withholding the whole rent because the pool is green is the fastest way to turn a construction defect into a case against you.

Ask for the libro del edificio. In Catalonia it is mandatory for new construction and for major rehabilitation, the developer has to hand it over with the building, and a copy is filed at the property registry. It contains the plans, the installation diagrams, the materials and construction solutions, the maintenance programme, the certificates for low voltage, gas, thermal installations and lifts where they apply, and the record of compulsory repairs. If the owner rented the villa without ever opening it, that tells you something about how the rest is being run.

How to build a snag list that survives

Then the smaller papers, which are just as useful in an argument: the acta de recepción with its date and whether it was signed with reservations, the licencia de primera ocupación, the manuals and warranties for the appliances, the name of the pool contractor and the terms of the pool guarantee, the irrigation plan for the garden, and the last service record for the aerotermia. A villa handed over in June with a pool and a garden has at least three separate contractors behind it, and each one blames the other two.

Room by room, one page per room, with the date on every photo. Put something in the frame for scale, a coin next to a crack, a tape measure across a door that no longer closes. Film the doors opening and closing and the taps running, twenty seconds each, because video settles arguments that a photo cannot. Note the temperature and whether it had rained. And do not fill, paint or silicone anything before it has been reported, because the moment you touch it the question becomes whether you made it worse.

What the fixes cost, and who ends up paying

Two rules for reading what you see. A hairline crack along a plasterboard joint in the first year is movement, and it comes back once after the first heating season. A crack of two millimetres or more running diagonally from a corner of a window or a door is a question for somebody with a level and a warranty, not for the painter. A pool losing one centimetre a day in August with wind and 30 degrees is evaporation. Two centimetres or more, every day, with the cover on, is a leak and belongs in the three-year bucket.

An independent inspection by an architect before the one-year mark costs a few hundred euros and occasionally finds what the eye cannot: insulation missing above a ceiling, a penetration through the waterproofing that was never sealed, a terrace with the slope running the wrong way. If the owner will not pay for it, it is still cheaper than discovering the same thing in year three, when the finish period has closed and everybody is tired.

Budget around 300 to 600 euros to repaint a room properly, 60 to 120 to adjust a door, 80 to 200 to redo a silicone joint line, 40 to 90 per square metre to retile a terrace, and 25 to 60 per square metre to renew a flat roof membrane. Inside the LOE periods the developer pays, through the owner. After them the owner pays, and the tenant pays nothing unless he caused it. That last sentence is why the written notice matters more than the argument.

One practical note for a first winter in a house that has never been lived in. New houses are wet: the screed, the plaster, the paint. Ventilate hard for the first months, keep the underfloor heating on low rather than off, and expect the interior doors to swell in November and shrink in May. If the aerotermia pressure drops every fortnight, that is not the house settling, that is a leak or an air pocket, and it should be in the file before the first invoice for the extra gas arrives.